FROM REPORTS
Lane closures will be implemented on westbound Ferrari Ranch Road from 8:15 a.m. – 5 p.m., on Thursday, March 8 and Friday, March 9, as part of the Lincoln Bypass project. One lane will remain open at all times to facilitate vehicle passage during the lane closures.
The lanes will be closed to install electrical conduit for the Ferrari Ranch Road Interchange.
The Lincoln Bypass will open to the public on schedule in 2012.
Please visit this website for ongoing information updates.
Showing posts with label Traffic. Show all posts
Showing posts with label Traffic. Show all posts
Tuesday, 6 March 2012
Wednesday, 1 February 2012
ALERT: Union Pacific to cause road closures in Rocklin
![]() |
JANA SAASTAD | PLACER COUNTY ONLINE |
Several roads in Rocklin and communities throughout western Placer County will be closed at railroad crossings for varying lengths of time during February while the Union Pacific Railroad completes track replacement work begun in December.
Read more »
Location:
Rocklin, CA, USA
Tuesday, 12 October 2010
Lincoln: Traffic now open on newly realigned Dowd Road
From the City of Lincoln:
Traffic is now permanently re-routed to the newly realigned Dowd Road near Sheridan, located between Dalby Road and Riosa Road.
The old Dowd Road will be demolished as part of construction on the Lincoln Bypass project, and motorists in the area should look for detour signs to familiarize them with the new Dowd Road location. The Lincoln Bypass project is scheduled for completion in 2012.
This realignment will require additional work in November with detours from the new section of Dowd Road on to West Wise Road. For more information on the project, go to www.lincolnbypass.com ; to learn more about transportation projects in the region, go to www.fixplacertraffic.net.
Traffic is now permanently re-routed to the newly realigned Dowd Road near Sheridan, located between Dalby Road and Riosa Road.
The old Dowd Road will be demolished as part of construction on the Lincoln Bypass project, and motorists in the area should look for detour signs to familiarize them with the new Dowd Road location. The Lincoln Bypass project is scheduled for completion in 2012.
This realignment will require additional work in November with detours from the new section of Dowd Road on to West Wise Road. For more information on the project, go to www.lincolnbypass.com ; to learn more about transportation projects in the region, go to www.fixplacertraffic.net.
Subscribe to:
Posts (Atom)

